Travel along the busy section of Beach Rd. is a guaranteed smooth ride on polling day for the heavy traffic flow expected.
Road contractors disrupted the normal traffic streaming over recent days to roll over a new surface coating of tar to smooth over any break in the seal.
Plastic cones were placed in selected areas of the road to direct traffic away from selected sections where contractors were working.
Beach road from the Vaisigano Bridge roundabout all the way out to the Mulinu’u Peninsula is a soft ride after maintenance work, even when stepping on the breaks to slow down and stop for the traffic lights.
